______________________________________________________________________
Alpha ESS Co., Ltd.
Page 11 of 31
Your Smart Energy
Installation
2.
Installation
This Manual introduces the basic steps how to install and operate AlphaESS eSTORE-
BAT-10.3
eSTORE-BAT-10.3 is a sealed component with no access to battery terminals or cell
components within module.
eSTORE-BAT-10.3 contains a Bi-pole DC isolator, which conforms to IEC 60947. It has
been operated in all live conductors
NOTE: please pay attention for unpacking the battery, the worst case
is that some components could be damaged.
Installation Site and Environment
General
The externals enclosure’s material is SPCC. The material thickness is 1.5 mm.
The eSTORE-BAT-10.3 can be installed in an outdoor or an indoor location.
In SN
□□□
-YYMMXXXX-PP on the packaging, PP for outdoor version will be 27.
Where battery systems are installed within a room, shall be located so that access to the
battery is not obstructed by the structure of the building, fixtures and fittings within the room.
eSTORE-BAT-10.3 adopts natural ventilation. The location should be clean, dry and
adequately ventilated. The room’s entry doors and panels shall open in the direction of
egress and allow unobstructed access to the battery for installation and maintenance
purposes.
The following location are
not allowed
for installation:
•
habitable rooms;
•
ceiling cavities or wall cavities;
•
on roofs that are not specifically considered suitable;
•
access / exit areas or under stairs / access walkways;
•
where the freezing point can be reached, such as garages,
carports or other places as well
•
as wet rooms (environmental category 2);
•
locations with humidity and condensation over 85%;
•
places where salty and humid air can penetrate;
•
seismic areas - additional security measures are required;
•
sites higher than 3000 meters above sea level;
•
places with an explosive atmosphere;
•
locations with direct sunlight or a large change in the ambient temperature;
600mm
600mm
1000mm
900mm