______________________________________________________________________
Alpha ESS Co., Ltd.
Page 14 of 31
Your Smart Energy
Installation
Step 3
:
Insert the expansion tube into the drilled hole. Pass the expansion screw through
the gasket and lock with a screwdriver. Fixed the battery on the wall with M8*60 screws.
If there are more than two batteries, please skip to Step 24.
Step 4: Remove the Cable Box and remove the front panel.