4
Connect now the control unit with the test stand by inserting and
locking the 37-pol connector (11).
Check if the two plug connections (9;10) for the position sensor (8)
and the load cell are inserted.
Connect now the power cable (12)
and switch on the instrument. The
lamp within the switch gleams red
when the instrument gets energized.
Check if necessary if the emergency
stop switch is pressed.
3.0 Engaging the instrument and preparing the measurement.
After switching on the instrument at the main switch,
you can see the start picture in the display. At the same
time an automatic function test takes place and the
force gauge gets initiated. After this test has been
finished succesfully, the change to the main menu
takes place.
Press now the button REF, it takes place an
automatic adjustment of the internal zero
reference (machine-zero). For this the load
cell gets driven into the highest position. After the
reference path has been effected succesfully, the test
stand is ready for use. Now you can choose the
wanted function within the main menu.
In dependence of the application different tools get assembled on the measuring axle and onto the
specimen stage. In case that these tools have been assembled in factory, the limits (limit of way) are
already adjusted.
Attention! In case that you use your own tools and/or effect the initiation without the help of
our technical service, please effect an assimilation of the limits within the service menu to
avoid collisions and by this damages on the test stand.