
Allied Construction Products, LLC www.alliedcp.com
TM103349_SP1000B_15sep
10
8.0 Operation
8.1 Pre-operation Checks
IMPORTANT
Unsatisfactory performance and/or equipment
damage may result if operated below or above the
accepted specifications. The Skid-Pac is designed
to provide optimum performance with reliable
service at the oil flow and pressure specified in
Technical Data Table. Prior to its first use, it’s
important to test the carrier’s hydraulic circuit.
CAUTION
Repair or replace any damaged components prior to
operation. Do not operate Skid-Pac until all faults
are corrected.
For safe and proper operation, perform a thorough
daily inspection of the equipment before use.
Daily, before operating:
1. Ensure Skid-Pac is securely attached to the
carrier. Check mounting pins and hardware for
wear or damage.
2. Excessive dirt and debris on the Skid-Pac can
decrease performance and should be removed.
3. Inspect the following for damage:
Inspect rubber of spring mounts for cracks or
separation from end plate
Inspect hoses, seals, motor and valve for oil
leaks
Check for loose or missing fasteners
NOTE
: Further maintenance details are located in
Section 9 of this manual.
8.2 Operation
CAUTION
Injury from flying debris. Do not
operate the Skid-Pac with workers in
close proximity of work zone.
Clear all personnel from work area
before the Skid-Pac is operated.
CAUTION
Injury from flying debris. Personal
protection equipment, including safety
eyewear, must be worn when operating
or servicing this equipment.
Prolonged exposure to high noise levels
may risk hearing impairment or loss.
Hearing protection must be worn when
equipment is in operation.
WARNING
Injury from falls into open excavations.
Establish pedestrian barriers around
open excavations. Ground vibrations
may collapse trench walls.
Excavations must be shored to meet federal, state
and local guidelines.
CAUTION
Never activate the Skid-Pac unless the operator is
seated in the operator’s seat and in full control of the
machine. Follow instructions in the operator's
manual provided with carrier.
1. Position carrier in-line with direction of work.
2. Position the Skid-Pac parallel to the work surface
and within view of the operator. The compaction
plate must be in full contact with the work surface
for maximum effectiveness.
3. Activate the Skid-Pac with the switch located in
the operator’s cab.
4. Use the carrier to push down on the Skid-Pac.
This will not only transfer the vibratory energy
more effectively to the soil but also provides a
static pressure which assists in the compaction.
5. The spring mounts can be stretched to
approximately one-half (1/2) their width.
IMPORTANT
Overstretching the rubber springs will contribute to
early spring failure. Stretch the spring mounts no
greater than approximately one-half (1/2) their width.
Summary of Contents for Skid-Pac 1000
Page 43: ...TM103349_SP1000B_15sep Notes ...
Page 44: ...TM103349_SP1000B_15sep R ...