Section 3
3 - 7
BRAKE-OFF Pressure Check
Test Equipment:
•
(1) 1,000 psi (6,895 kPa) Gauges
Connect pressure gauges to test ports:
• BO
Instructions
1. With the engine shut off, connect a 1000 psi pressure
gauge to the
BO
pressure test port.
2. Start dozer and set to high-free idle
3. Measure pressure with the
BRAKE-OFF
switch
activated.
4. The brake-off clutch requires 355 psi to release. Low
pressure will result in premature wear of the friction
discs and added heat generation
If pressure is not at least 355 psi, check for:
1. Improper pilot supply pressure.
2. Malfunctioning solenoid valve.
3. Leaking pressure hoses or fi ttings.
4. Restriction in pressure hose or manifold port.
1000 PSI Gauge
at BO Port
Figure 3-7 Test Equipment Setup
Summary of Contents for H12E
Page 8: ...vi Notes ...
Page 48: ...General 1 40 Notes ...
Page 54: ...Section 1 1 46 Figure 1 35 H12E Hydraulic Electrical Schematic Option Code B CAT D8T C74 ...
Page 55: ...Section 1 1 47 Figure 1 36 H12E Hydraulic Electrical Schematic Option Code D CAT D8T C74 ...
Page 59: ...Section 1 1 51 Figure 1 40 H12E Hydraulic Electrical Schematic Option Code D CAT D8R C59 ...
Page 63: ...Troubleshooting 2 4 Notes ...
Page 75: ...Service 3 12 Notes ...
Page 90: ...Section 4 4 15 Intentionally Blank ...
Page 102: ...Section 4 4 27 Intentionally Blank ...
Page 108: ...Section 4 4 33 Intentionally Blank ...
Page 116: ...Section 4 4 41 Intentionally Blank ...
Page 119: ...Repairs 4 44 Notes ...
Page 120: ......