Section 4
4 - 35
1.
Install the counterbalance relief (CBR) manifold on
the mounting bracket. Leave mounting bolts loose.
2.
Install the control manifold. Torque capscrews to 28
ft-lbs (38 N-m).
3.
Reinstall hose and tube assemblies. Alternately
tighten connections to prevent placing motor tubes
in a bind. Adjust mounting bracket as necessary to
align with manifold.
4.
Reinstall covers as shown. Torque M12 hardware
to 66 ft-lbs (90 N-m). Torque M16 hardware to 165
ft-lbs (225 N-m).
Summary of Contents for H12E
Page 8: ...vi Notes ...
Page 48: ...General 1 40 Notes ...
Page 54: ...Section 1 1 46 Figure 1 35 H12E Hydraulic Electrical Schematic Option Code B CAT D8T C74 ...
Page 55: ...Section 1 1 47 Figure 1 36 H12E Hydraulic Electrical Schematic Option Code D CAT D8T C74 ...
Page 59: ...Section 1 1 51 Figure 1 40 H12E Hydraulic Electrical Schematic Option Code D CAT D8R C59 ...
Page 63: ...Troubleshooting 2 4 Notes ...
Page 75: ...Service 3 12 Notes ...
Page 90: ...Section 4 4 15 Intentionally Blank ...
Page 102: ...Section 4 4 27 Intentionally Blank ...
Page 108: ...Section 4 4 33 Intentionally Blank ...
Page 116: ...Section 4 4 41 Intentionally Blank ...
Page 119: ...Repairs 4 44 Notes ...
Page 120: ......