6.0 Installation – [cont’d]
Fig. 6-22 Gray Connector – 3 Pole Plus Ground
6.12 Wiring ‘2E’ LLC Stops Breaker / Activates
Dash Lamp
Refer to Fig. 6-23 2E. Wire per diagram and
instructions. When triggered, the Low Level Control
cuts power to the breaker’s operating valve. Wire 3
will hold the relay energized until ignition switch is
turned off.
6.12.1 Electrical Diagram ‘2E’ – Warning Light &
Breaker Shut Down
1. Install the fuse holder in a location that’s
accessible for service.
2. Find a protected location for installing the relay.
3. Install the dash lamp in a position inside the cab
so it’s visible to the operator while the breaker is
in operation.
6.12.2 Gray Connector (26) with Pre-wired Cord
RD/1 Red (+)
BK/3 Black (+)
BN/2 Brown (Not Used)
YE/GN (Not Used)
In Fig 6-23, wires identified as 1, 2, 3, 4, 5 and 6 are
not supplied with the installation kit. Source locally.
BreakerLube
3
1
2
1
2
3
RD/1
BN/2
BK/3
YE/GN
Gray
Connector