
SECTION 11.0
CARE AND MAINTENANCE
11.1 Care and Maintenance
Schedule
During Shift
·
Lubricate demolition tool every two
hours or anytime the tool appears dry.
(Refer to Section 8-5.)
·
Check lube fitting for damage.
Daily
·
Tighten threaded connections (during
first 50 hours).
·
Check for leaks in hydraulic lines.
·
Check that pipe clamps fit correctly.
·
Check mounting bracket for wear.
Weekly
·
Check threaded connections.
·
Check retainer pin and roll pin in cylin-
der housing for tight fit.
·
Check demolition tool for burrs. Pay spe-
cial attention to slot area.
Every Two Weeks
·
Check precharge chamber pressure.
·
Check demolition tool for wear.
·
Check tool bushing for wear.
·
Check hammer box for wear.
Monthly
·
Check piston impact surface for dents.
·
Check impact surface (top) of demolition
tool for chips.
·
Check impact surface of tool bushing for
cracks, chips, wear or looseness.
As Required
·
Replace bent and damaged tubes.
·
Replace any damaged hose(s).
·
Clean hydraulic oil filter.
11.1.1 Warranty Protection
Maintain written records of Street Ham-
mer maintenance, service and repair.
These records will be helpful if warranty
coverage is ever in question. Each record
shall include :
·
The date of service, maintenance or re-
pair.
·
A description of the service, maintenance
or repair performed. Include part num-
bers if applicable.
·
Copies of purchase order(s) and in-
voice(s) for repair parts and service.
·
The name and signature of the person
performing the service, maintenance or
repair.
11-1
6-1-03
A
LLIED
Street Hammer
AS Series
Summary of Contents for AS 342
Page 9: ...6 1 03 1 1 ALLIED Street Hammer AS Series ...
Page 61: ...ALLIED Street Hammer AS Series ...
Page 62: ......