
SECTION 9.0
OPERATION
9.1 Operator Check List
Before operating the Street Hammer, in-
spect the following:
·
Check that hose and tube connections
are secure.
·
Check all fasteners for wear and tight-
ness.
·
Check all fasteners according to the
maintenance schedule (see Section 11.0).
·
Check that demolition tool is inserted
properly.
·
Be sure scheduled maintenance is per-
formed before operating the Street Ham-
mer.
·
Frequently check the oil temperature.
The temperature of the hydraulic oil
must never exceed 176oF. [80oC.].
·
Be sure all tools that will be required for
functions to be performed are available.
·
Remember to lubricate the demolition
tool every two hours during operation.
9.2 Tools Required By Operator
No special tools are required, but the fol-
lowing tools are recommended:
·
safety glasses & gloves
·
sledge hammer
·
drift pin
·
3/4-inch drive socket wrench
·
3/4-inch square drive socket set
·
grease gun
·
open end wrenches
·
caliper for checking tool wear
9.3 Operating the Street Hammer
~
WARNING
The precharge chamber shall only
be filled with 99.8% pure nitrogen
gas. Make sure no other gas, i.e.,
air or oxygen, is allowed into the
precharge chamber; this could re-
sult in an explosion.
~
CAUTION
Check the oil temperature often to
ensure it does not exceed 176oF
[80oC]. If higher temperatures are
measured in the tank, refer to Sec-
tion 10.0 Troubleshooting.
6-1-03
9-1
A
LLIED
Street Hammer
AS Series
Summary of Contents for AS 342
Page 9: ...6 1 03 1 1 ALLIED Street Hammer AS Series ...
Page 61: ...ALLIED Street Hammer AS Series ...
Page 62: ......