
The demolition tool must be lubricated ev-
ery two hours during operation as follows:
1. Check that hammer is securely mounted
to carrier; on skid steers, be sure attach-
ment locking pins are securely engaged.
~
CAUTION
Be sure to maintain contact pres-
sure on the demolition tool during
lubrication procedure or hammer
could be damaged.
2. On level ground, stand the hammer ver-
tically on the demolition tool and apply
contact pressure. This ensures that the
tool is in contact with the impact ring to
prevent grease from entering piston
area. Refer to Figure 8-3.
~
WARNING
Serious injury or death could result
if carrier is not properly secured
and locked when performing any
carrier or hammer maintenance.
Follow all safety instructions in-
cluded in carrier manual and the
CIMA Safety Manual supplied with
hammer.
3. Block carrier wheels to ensure carrier
stability.
4. Shut off carrier and engage carrier in-
terlock. Operator shall remain in cab.
~
WARNING
DO NOT crawl between carrier and
hammer. Serious injury could re-
sult.
5. Assistant: Reach around hammer from
the side, remove cover plug and attach
grease gun to lubrication fitting
as
shown in Figure 8-4.
6. Lubricate until grease emerges from the
gap between the tool bushing and the
demolition tool.
6-1-03
8-3
A
LLIED
Street Hammer
AS Series
Figure 8-2. Lifting Demolition Tool
Figure 8-3. Keep Contact Pressure on Tool
Summary of Contents for AS 342
Page 9: ...6 1 03 1 1 ALLIED Street Hammer AS Series ...
Page 61: ...ALLIED Street Hammer AS Series ...
Page 62: ......