CentreCOM GS970EMX Series Installation Guide for Standalone Switches
83
10. Slide the switch into the BRKT-J23 brackets. Refer to Figure 47.
Figure 47. Sliding the Switch into the BRKT-J23 Brackets
Note
If you are installing the switch with two brackets, skip the next step
and go to Chapter 8, “Verifying the Switch” on page 95. If you are
installing the switch with four brackets, continue with the next step.
Summary of Contents for CentreCOM GS970EMX Series
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 56: ...Chapter 2 Beginning the Installation 56...
Page 70: ...Chapter 4 Installing the GS970EMX 20 Switch in an Equipment Rack 70...
Page 104: ...Chapter 8 Verifying the Switch 104...
Page 116: ...Chapter 10 Troubleshooting 116...