CentreCOM GS970EMX Series Installation Guide for Standalone Switches
107
Guidelines to Handling SFP and SFP+ Transceivers
Review the following guidelines before installing SFP and SFP+
transceivers in the switch:
Transceivers are hot-swappable. You can install them while the
switch is powered on.
For a list of supported transceivers, refer to the product’s data
sheet on the Allied Telesis web site.
The operational specifications and fiber optic cable requirements of
the transceivers are provided in documents included with the
devices.
You should install a transceiver before connecting its fiber optic
cable.
Fiber optic transceivers are dust sensitive. Always keep the plug in
the optical bores when a fiber optic cable is not installed, or when
you store the transceiver. When you do remove the plug, keep it for
future use.
Unnecessary removal and insertion of transceivers can lead to
their premature failures.
Caution
Transceivers can be damaged by static electricity. Be sure to
observe all standard electrostatic discharge (ESD) precautions,
such as wearing an anti-static wrist strap, to avoid damaging the
devices.
E92
Summary of Contents for CentreCOM GS970EMX Series
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 56: ...Chapter 2 Beginning the Installation 56...
Page 70: ...Chapter 4 Installing the GS970EMX 20 Switch in an Equipment Rack 70...
Page 104: ...Chapter 8 Verifying the Switch 104...
Page 116: ...Chapter 10 Troubleshooting 116...