34
505872
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
NOTE: The butt splice connector will need to be
replaced during reinstallation.
(3) Cut harness strap holding wires to bracket.
NOTE: Harness strap must be replaced during
reinstallation.
(4) Through Serial No. S6348564YA –
Remove two screws holding counter to
counter bracket.
Starting Serial No. S6348564YA – The
counter is mounted inside the meter case
with two-sided tape.
NOTE: When installing a new counter, remove the
protective backing from the tape located on
underside of new counter. Press the new counter
firmly in place. Tape on counter will reach full
adhesion after 24 hours.