Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
27
Component Test Procedures
Chapter 2
7. Remove the pulse transformer board. The switching power supply board
is mounted on the back of the pulse transformer board but does not
need to be removed from the pulse transformer board for this test.
• For frame A devices, see Pulse Transformer and Switching Power
Supply Circuit Board Replacement on page
• For frame B devices, see Remove the Pulse Transformer and
Switching Power Supply Circuit Boards on page
.
8. With a digital multimeter set for a “continuity check”, measure each
connection point on the pulse transformer board that is listed in
• For frame A device, see
on page
for connector
locations.
• For frame B device, see
for connector
locations.
9. If any of the actual measurements are out of tolerance, replace the pulse
transformer board.
IMPORTANT
Mark all connections and wires before removal to avoid incorrect
wiring during reassembly.
Table 5 - Load Pulse/Snubber Circuit Measurements
For SCR
Measure
From
To
Meter reading
Connector XY Pinout
1
KG1
XY-4
“open circuit”
4
KG4
XY-1
2
KG2
XY-5
5
KG5
XY-2
3
KG3
XY-6
6
KG6
XY-3
01
KG01
XY-1
04
KG04
XY-4
02
KG02
XY-2
05
KG05
XY-5
03
KG03
XY-3
06
KG06
XY-6
10
.
.
.
.
.
1
Summary of Contents for 23PFC
Page 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Page 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Page 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Page 149: ......