100
Rockwell Automation Publication 23PFC-TG001A-EN-P - March 2018
Chapter 4
Frame B Field Controller Part Replacement Procedures
Table 11 - DIP Switch S3 and S4 Settings - FIR2-
xx
-FC
2. Install the pulse transformer board and switching power supply board in
the reverse order of removal.
3. Verify that the four plastic board stabilizers that are mounted on the top
air flow plate are placed one on either side of each board.
IMPORTANT
A blank cell below a switch in
indicates that the setting is “OFF”.
Output
Current
(Amps)
DIP Switch S3
DIP Switch S4
S3-1
S3-2
S3-3
S3-4
S3-5
S3-6
S3-7
S3-8
S4-1
S4-2
S4-3
S4-4
S4-5
S4-6
S4-7
S4-8
245
ON
ON
ON
ON
ON
ON
ON
ON
365
ON
ON
ON
ON
ON
ON
ON
570
ON
ON
ON
ON
ON
ON
ON
ON
ATTENTION:
Each gate lead cable must be connected to the exact connector
from which it was removed on the pulse transformer circuit board or damage
to the device can occur.
One plastic stabilizer must be on either side of each board
Air flow plate
Plastic
stabilizers
Top view of pulse transformer board
Side cut-away view
Pulse transformer board
Switching power supply board
Summary of Contents for 23PFC
Page 8: ...8 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Preface Notes ...
Page 130: ...130 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Appendix A Schematics Notes ...
Page 148: ...148 Rockwell Automation Publication 23PFC TG001A EN P March 2018 Index Notes ...
Page 149: ......