[email protected]
Movil:959440045
172
Lifting height for transport of bowl
Specification
A minimum height is required to lift the bowl, bowl
parts and the bowl spindle, see the drawing
‘‘8.6.2 Foundation plan” on page 157.
Recommendation
When two or more separators are installed, the
lifting height may have to be increased to enable
parts from one separator to be lifted and moved
over an adjoining assembled separator.
Space for oil changing
Specification
The oil filling device must not be blocked by floor
plate arrangement, etc.
Recommendation
It should be possible to place a portable collecting
tray under the oil filling device drain hole.
8.7.3
Foundations
Specification
•
The separator should be installed at floor
level, see ‘‘8.6.2 Foundation plan” on page
157.
•
The separator must be installed on a strong
and rigid foundation to reduce the influence of
vibrations from adjacent machinery.
•
The foundation should be provided with a
cofferdam.
NOTE
When lifting a separator it must always be
hung securely. See the separate lifting
instruction in this book.
www.fdm.com.pe
Summary of Contents for MMPX 303SGP-11
Page 6: ...ventas fdm com pe fdmsac gmail com Movil 959440045 6 www fdm com pe...
Page 14: ...ventas fdm com pe fdmsac gmail com Movil 959440045 2 Safety Instructions 14 www fdm com pe...
Page 78: ...ventas fdm com pe fdmsac gmail com Movil 959440045 78 www fdm com pe...
Page 124: ...ventas fdm com pe fdmsac gmail com Movil 959440045 124 www fdm com pe...
Page 155: ...ventas fdm com pe fdmsac gmail com Movil 959440045 155 www fdm com pe...
Page 159: ...ventas fdm com pe fdmsac gmail com Movil 959440045 159 www fdm com pe...
Page 174: ...ventas fdm com pe fdmsac gmail com Movil 959440045 174 www fdm com pe...
Page 176: ...ventas fdm com pe fdmsac gmail com Movil 959440045 176 www fdm com pe...
Page 178: ...ventas fdm com pe fdmsac gmail com Movil 959440045 178 www fdm com pe...