9
Install protection sheets (if provided).
10
Connect the pipes.
11
If the plate heat exchanger does not seal
when the
A
measure has been reached, it
can be tightened further to the given
A
measure value minus 0.5%.
200000420-4-EN-GB
63
Maintenance 6
EN