
4.8 Inspection before installation
When the equipment is placed in its intended location, always perform the
inspections listed below:
• Check the
A
measure.
• Make sure that all bolts are properly tightened.
• Make sure that the stands and feet are properly tightened.
• Check that connection piping can be removed to perform service.
• Make sure that there is enough space to remove plates on one side of the
plate heat exchanger.
200000420-4-EN-GB
43
Installation 4
EN