
3.3 Intermediate Service (IS), check points
3 Dismantling/Assembly
70
1.
Remove the old lining and place the new
lining blank in the wall pillar.
2.
Fasten the mounting tool between the wall
pillars as shown in the illustration. Clamp the
wear lining with the tool.
3.
Tighten the tool nut with a spanner until the
lining is firmly pressed to its seat.
4.
Bend the shank (1) at right angles to the
outside of the bowl wall using a drift.
5.
Back off the nut of the tool and remove it.
6.
Remove the lining and cut the shank so that it
ends 0,5 - 1,5 mm (A) from the bowl wall.
7.
Fit the wear lining in the wall pillar and clamp
it with the tool. Knock the shank flat against
the wall of the pillar.
S
003
20
1
1
G
0
29
86
1
1
G
0
298
71
1
G
0
29
89
21
G
0
2
989
41
S
0
031
81
1
Summary of Contents for AFPX 617XGV-14/74CG
Page 1: ...0 5 0 0 E 0 DVcgZTV RZ_eV_R_TV R_fR DVaRcRe c 27AI I8G 48 a SdRc 1 Z ATe...
Page 6: ...6...
Page 8: ...8...
Page 14: ...1 Safety Instructions 14...
Page 46: ...2 7 Common maintenance directions 2 Maintenance Directions 46...
Page 103: ...103 3 Dismantling Assembly 3 5 Major Service MS dismantling...
Page 148: ...148...
Page 150: ...150...
Page 154: ...154...