
16/33
ALFA IN a.s. ©
www.alfain.eu
VENTING OF THE TORCH COOLING SYSTEM
1. After filling an empty torch cooling system or after refilling the fluid after a
large leak and aeration, a complete venting of the circuit is required.
2. Remove the coolant reservoir cap and connect the water quick couplers
with the fluid circuit connecting hose.
3. Run the cooling test for about 30 seconds.
4. Connect the torch and run the cooling test for about 30 seconds.
5. If the error message "
Err 2
" -
Low fluid pressure
lights up after pressing
the torch button, the procedure must be repeated.
COOLING UNIT CONVERSION KIT
The machine with a pull-out storage box can be converted to a water-cooled
version. A conversion KIT E.466 is required. The conversion KIT has to be built
into the existing pull-out storage box. We will send you the conversion
instructions together with the conversion kit E.466.
7
BASIC SETTINGS
DESCRIPTION OF THE CONTROL PANEL
Figure 7 - Control Panel
Item. Description
V1
Button: gas test
V2
Button: Pulse mode
V3
LED - shines when PULSE mode is selected.
V4
Quick JOB selection