BOSS – Installation, Operation and Maintenance Manual
A l e n c o n S y s t e m s L L C - P a g e
|
33
Before starting the BOSS, we need to provide the power flow
“Set Direction”
and the “
Current
Setpoint”
expected from the BOSS. Both these features are available within the command
window seen in figure.
“Set Direction” Command –
Choose the appropriate direction
Bus to Battery or
Battery to Bus
“Current Set Point” Command –
This command sets the current required to be drawn from the source
Figure 29: Current Set-Point Command
Once the two parameters are set, the capacitors will begin to precharge at a rate set in
configuration.
Figure 27: HUB Commands
Figure 28: Direction Command for
BOSS ONLY