Main task
Subtask (chapter/page)
Software installation
•
•
“Installing the fast download application” (p. 6-7)
•
“Preparation and test of the main unit” (p. 7-4)
•
“Fast E software download” (p. 6-8)
•
“Connecting the ITM-CIT to the E” (p. 6-10)
E provisioning
•
•
•
•
“Confirm/Update the MIB” (p. 6-22)
Stand alone tests
(E tests)
•
“E1 tributary ports distribution wiring test”
(p. 7-5)
•
“Line port connection to optical distribution frame
test” (p. 7-8)
•
“PDH option card test” (p. 7-12)
•
“Optical X6STM1 option card test” (p. 7-15)
•
“X8PL and X5IP option card test” (p. 7-18)
•
“X12SHDSL-V2 option card test” (p. 7-21)
Link acceptance tests
•
“Connecting the fiber cables” (p. 8-2)
•
•
General information
Sequence of steps
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-313-103R8.0
Issue 2
July 2009
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
2-13