Albalá Ingenieros | Manual
SEM2000C01
4. OPERATION
This section describes the significance of the front panel indicators of the SEM2000C01
module and their remote control and monitoring ability.
4.1. Front panel description
The appearance of the front panel and the elements it contains are shown in the
following illustration.
Front panel of the SEM2000C01
In addition to the connectors previously described in the Interconnection section the
front panel includes the following indicators and controls:
Each of the two electrical ports has an associated green LED that lights up when the link
operates at 1Gbit/s, stays off for other datarates and a yellow LED that both lights up to
indicate that the link has been established and blinks when there is activity. The optical
port has a single associated yellow LED that lights up when the link has been
established.
The REF. LED lights up in green when the presence of a 10MHz signal is detected on the
rear bus. Otherwise this LED lights up in red.
15
Summary of Contents for SEM2000C01
Page 2: ...SEM2000C01 ...
Page 4: ...SEM2000C01 ...
Page 7: ...Albalá Ingenieros Manual SEM2000C01 1 3 Block diagram 7 ...
Page 8: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 8 ...
Page 10: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 10 ...
Page 20: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 20 ...
Page 22: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 22 ...
Page 24: ...Albalá Ingenieros Manual SEM2000C01 SEM2000C01 24 ...