21
4. INSTALLATION
4.1 Reference Standard
This appliance meets the requirements of:
- UNI EN 677 for GAS-FIRED CENTRAL HEATING BOILERS. SPECIFIC REQUIREMENTS FOR CON-
DENSING BOILERS WITH NOMINAL HEAT INPUT
≤
70 kW
- IPX4D rating for electrical appliances.
- BOILER EFFICIENCY DIRECTIVE 92/42 CEE
Failure to install a gas appliance correctly and in accordance with the above norms could lead to prosecution.
It is in the interest of the installer and safety that the law is complied with.
The manufacturers instructions form an integral part of the installation and should be left with the appliance
but do not over ride in anyway statutory obligations.
4.2 Boiler Room – Installation Requirements
Please refer to local and national standards in force in the Country of destination of the product. In particular
the manufacturer recommends.
4.3 Transport and Unpacking
The boiler is in cardboard box. Warning signs are so that they can be seen during transport and storing.
Do not step
on the box.
When the box is put
on the
fl
oor, the arrows
should point upwards.
Maximum 4 boxes can be
place on top of eachother.
Do not drop
the box.
Keep the box away
from water.
The boiler can be carried by the people by lifting it up at the holes on the sides.
The boiler should be kept in a dust- and moisture-free place and should not be taken out of its package until
it is to be installed.
The boiler can be installed after the completion of the electrical-and water systems.