OPERATION
PVB-PVS 08/20
Operation Section 4-13
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
Pulverizer PRE-OPERATION Inspection
Pulverizer ID#___________________ Make__________________________
Date: ________________________
Shift__________________________
Before conducting the inspection, make sure the tractor engine is off, all
rotation has stopped and the tractor is in park with the parking brake
engaged. Make sure the aerator is resting on the ground or securely blocked
up and all hydraulic pressure has been relieved.
Operator’s Signature:_____________________________________________________
Item
Condition at
Start of Shift
Specific Comments if
not O.K.
The operator’s manual is in the canister.
All safety decals are in place and legible.
The hitch connection pins are properly retained.
There are no cracks in Hitch.
All frame bolts are in place and tight.
The roller bearing are properly lubricated and retained
The rollers are clear of mud and debris
The roller attachment bolts are in place and tight
The scarifier shanks are properly retained
The scarifier points are in good condition
DO NOT OPERATE an UNSAFE TRACTOR or IMPLEMENT
Summary of Contents for BUSH HOG PVB
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Page 18: ......
Page 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 25: ...Operation Section 4 1 OPERATION SECTION...
Page 46: ......
Page 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Page 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Page 52: ......
Page 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...