OPERATION
PVB-PVS 08/20
Operation Section 4-16
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
9. Shutting Down the Implement
To shut down the implement, first bring the tractor to
a complete stop.
Park the tractor on a level surface, place the
transmission in park or neutral and apply the
parking brake, lower the attached implement to the
ground, shut down the engine, remove the key,
before exiting the tractor.
10.1 Detaching Pulverizer from Tractor
Lower the implement to the ground with rockshaft control in position control. Remove top link from mast,
disconnect the hitch arms from bottom pins and pull tractor away from implement.
10. DISCONNECTING THE PULVERIZER FROM THE TRACTOR
Before disconnecting the pulverizer, all movement must cease. Move the pulverizer to a level storage location
and lower the implement to the ground. If the pulverizer is not resting securely on the ground, block the
implement up securely before attempting to disconnect it from the tractor.
Use extreme care to keep feet and hands from under the pulverizer and clear of any pinch points.
OPS-
0051_A
Always shut the Tractor completely down, place the transmission in park, and set the
parking brake before you or anyone else attempts to connect or disconnect the Implement
and Tractor hitches.
(S3PT-15)
Summary of Contents for BUSH HOG PVB
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Page 18: ......
Page 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 25: ...Operation Section 4 1 OPERATION SECTION...
Page 46: ......
Page 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Page 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Page 52: ......
Page 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...