OPERATION
PVB-PVS 08/20
Operation Section 4-21
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
13.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the
proper equipment required. Using adequately sized
chains, heavy duty straps, cables and/or binders,
securely tie down both the front and rear of the
tractor utilizing the proper tie down locations as
specified by the tractor manufacturer.
OPS-U- 0025
Summary of Contents for BUSH HOG PVB
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Page 18: ......
Page 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 25: ...Operation Section 4 1 OPERATION SECTION...
Page 46: ......
Page 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Page 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Page 52: ......
Page 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...