Subject to changes in line with technical progress.
33
3061955
Shut-down
7
Shut-down
7.1
Decommissioning
The system can remain permanently filled with the glycol/water mixture.
Disconnect the system from the power supply before beginning work (shut down all poles) and secure it to prevent
unauthorised reactivation.
Important!
Certain system parts are under pressure. Therefore, drain off the glycol/water mixture before starting the dis-
mantling.
If the system is decommissioned for a long period of time, the instructions for the individual components must
be observed.
The information from the component manufacturers must also be followed (request this information if neces-
sary).
Important!
In winter, there is a risk of freezing due to residual water in individual components.
If necessary, take suitable measures such as adding frost protection/taking frost protection measures.
Before recommissioning, follow the points in the commissioning and maintenance chapters.
7.2
Dismantling
Disconnect the system from the power supply before beginning work (shut down all poles) and secure it to prevent
unauthorised reactivation.
Important!
Certain system parts are under pressure.
Disassembly may only be performed by trained technical personnel.
Dismantling must be carried out according to the currently valid and applicable occupational safety and accident
prevention regulations.
7.3
Disposal
Do not dispose of worn-out equipment, spent batteries or rechargeable batteries in domestic waste.
When disposing of the HYDROOPT M
®
, operating material or accessories, comply with the relevant local
environmental and recycling regulations in your country and community that are applicable at the time
when the activity is undertaken.