TUBING CONNECTIONS
Revision 0
10-1
10. TUBING
CONNECTIONS
¼” ” ½” ” ¾”
Flare Nuts
11-13 40-45 60-65 70-75 80-85
Valve Cap
13-20 13-20 18-25 18-25 40-50
Service Port Cap
11-13 11-13 11-13 11-13 11-13
1. Valve Protection Cap-end
2. Refrigerant Valve Port (use Allen wrench to open/close)
3. Valve Protection Cap
4. Refrigerant
Valve
5. Service Port Cap
6. Flare
Nut
7. Unit Back Side
8. Copper Tube
When the outdoor unit is installed above the indoor unit an oil trap is required every 5m along the suction line
at the lowest point of the riser. Incase the indoor unit is installed above the outdoor, no trap is required.
TORQUE (Nm)
TUBE (Inch)
Summary of Contents for K XLN24 RC 3PH
Page 12: ...OUTLINE DIMENSIONS Revision 0 4 1 4 OUTLINE DIMENSIONS 4 1 K XLN 24 30...
Page 13: ...OUTLINE DIMENSIONS 4 2 Revision 0 4 2 Outdoor Unit OU724 4 3 Outdoor Unit OU830...
Page 29: ...WIRING DIAGRAMS Revision 0 7 3 7 5 Outdoor Unit OU724 OU830 3PH...
Page 31: ...ELECTRICAL CONNECTIONS 8 2 Revision 0 8 3 K XLN 24 30 3PH...
Page 33: ...REFRIGERATION DIAGRAMS 9 2 Revision 0 9 1 2 K XLN 30 R410A...
Page 34: ...REFRIGERATION DIAGRAMS Revision 0 9 3 9 2 Cooling Only Models 9 2 1 K XLN 24 30...
Page 37: ...CONTROL SYSTEM 11 2 Revision 0 11 1 3 Main PCB Controller...
Page 78: ...EXPLODED VIEWS AND SPARE PARTS LIST Revision 0 13 5 13 3 Exploded view of outdoor unit ONG...
Page 79: ...EXPLODED VIEWS AND SPARE PARTS LIST 13 6 Revision 0...