![Airwell Airflow 2020 Installation And Operating Manual Download Page 25](http://html.mh-extra.com/html/airwell/airflow-2020/airflow-2020_installation-and-operating-manual_2879847025.webp)
25
START-UP SEQUENCE
7 - START-UP
START-UP SEQUENCE
√
HEATER OPERATION CHECK (option)
1
set the unit to heating mode
2
temporarily set parameter 208=1
3
with the unit not powered, open the compressor's fuse holder (FU1 to sizes 200-650 / FUG to sizes 70-120)
4
start the unit and wait until the heaters begin treating the supply air
5
with the unit not powered, set parameter 208=0
6
close the compressor's fuse holder
√
HUMIDIFIER OPERATION CHECK (option, sizes 200-650 only)
1
set the unit to heating mode
2
through the ambient thermostat (parameter P05) or service keypad (parameter 30),
set the humidity set-point to 90%
3
check that the cylinder fills with water and starts boiling
4
a full cylinder combined with a very low current absorption value (with respect to the nominal value indicated
on the cylinder) and a delay in boiling do not imply any malfunctions, but indicate that the water is poorly
conductive and that the cylinder will take some time to reach full power
Summary of Contents for Airflow 2020
Page 1: ...Installation and operating manual Décember 2017 ...
Page 69: ...User manual ...