Issue Date: 29 Jan 2009 Rev 1
Page 12
•
INSERT NOSE BATTENS. Insert the nose battens tail
end first and locate them on the fittings on the front of
the keel.
•
INSTALL NOSE FAIRING. Attach the nose fairing by applying
the top velcro first then gently tension over the nose plates and
attach the velcro to the undersurface.
•
PRE-FLIGHT INSPECTION. You are now ready for the wing pre-flight inspection as outlined
in the next section. It is imperative that you carry out this inspection every time you rig and
before you fly.
Summary of Contents for Sting 3
Page 2: ...PART 108841 THIS PAGE LEFT BLANK INTENTIONALLY...
Page 30: ...Issue Date 29 Jan 2009 Rev 1 Page 30 THIS PAGE LEFT BLANK INTENTIONALLY...
Page 34: ...Issue Date 29 Jan 2009 Rev 1 Page 34 STING X BAR LEADING EDGE JUNCTION A4 4716...
Page 37: ...Issue Date 29 Jan 2009 Rev 1 Page 37 REAR LEADING EDGE ASSEMBLY STING A4 6859...
Page 38: ...Issue Date 29 Jan 2009 Rev 1 Page 38 STING III 154 NOSE JUNCTION ASSEMBLY A4 4717...
Page 40: ...Issue Date 29 Jan 2009 Rev 1 Page 40 STING III 168 NOSE JUNCTION ASSEMBLY A4 7743...
Page 42: ...Issue Date 29 Jan 2009 Rev 1 Page 42 STING III KEEL ASSEMBLY A4 7608...
Page 45: ...Issue Date 29 Jan 2009 Rev 1 Page 45 CONTROL FRAME STING III 154 PREASM A4 7625...
Page 47: ...Issue Date 29 Jan 2009 Rev 1 Page 47 CONTROL FRAME STING III 168 PREASM A4 7747...
Page 49: ...Issue Date 29 Jan 2009 Rev 1 Page 49 STING HANG LOOP ASSEMBLY A4 4796...
Page 50: ...Issue Date 29 Jan 2009 Rev 1 Page 50 STING III SAIL TO AIRFRAME ASSEMBLY A4 7748...
Page 53: ...Issue Date 29 Jan 2009 Rev 1 Page 53 STING III INTERCHANGE TABLE A4 7749...
Page 54: ...Issue Date 29 Jan 2009 Rev 1 Page 54 THIS PAGE LEFT BLANK INTENTIONALLY...