
8
Chapter 2� Hardware Setup
This section describes a simple instruction guide for installing the hardware components
on the serverboard system. Turn off and unplug all system and peripheral devices before
proceeding.
2�1 Central Processing Unit
The serverboard supports dual Xeon scalable processors and Socket P0 (LGA-3647).
2�1�1 Processor Installation
To ensure a safe and easy setup, you need to prepare before installation:
a T20 Torx screwdriver
ESD wrist strap/mat and conductive foam pad
CAUTION
The pins of the processor socket are vulerable and easily susceptible to damage if fingers or any
foreign objects are pressed against them. Please keep the socket protective cover on when the
processor is not installed
.
CAUTION
When unpacking a processor, hold the processor only by its edges to avoid touching the contacts.
Standard Processor Assembly:
A standard processor assembly is comprised of PHM(Processor Heat sink Module)
components and processor socket assembly.
Heat sink
Standard
Processor Clip
Standard
Processor
Bolster Plate
Precsessor
Socket
PHM Components
Processor
Socket Assembly
This information is provided for professional technicians only.
Summary of Contents for SB401-VG
Page 1: ...UM_SB401 VG_v1 2_081921 SB401 VG Storage Barebone User s Manual...
Page 12: ...3 Chapter 1 Product Features 1 3 System Block Diagram...
Page 49: ...40 Chapter 3 Hardware Settings 3 3 1 Placement Top view Backside view 3 3 HDD Backplane 24 Bay...
Page 74: ...65 Chapter 5 BMC Configuration Settings Step 2 Input the IP address Set static IP...
Page 75: ...66 Chapter 5 BMC Configuration Settings Step 3 Input the subnet mask address...