INSTALLATION INSTRUCTIONS
Correct wiring of the Power Pack
NOTE
: All battery power leads must have a core area not less than 16mm² and be double
insulated.
Connect both battery cables (+ and -) directly from the battery to the power pack.
ATTENTION:
By fixing the battery cable on the starter switch, you must hold up the
lock nut.
* Energize the power pack and actuate the valve to be sure they are operating properly.
* Please check the operating temperature regularly. It should not increase by more than
-20°C to +70°C.
* Check a new power pack for leakage after a short period of time. Tighten any fittings that
may be leaking.
TURNING
HOLD UP
Starter Switch
Lock Nut
Battery Cable
9
Summary of Contents for HTK-500ST/AL
Page 17: ...17 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ...31 ...
Page 32: ...32 ...