4
STEP BY
STEP
7
Take the line
23D
and check the shapes of the
ends and the position of the pin in the centre
section, to ensure you get it the right way round. Fit
one end of the line into the socket on the tank
23B
,
and fit the pin into the hole in part
17A
. The inset above
shows the line in place – the free end of the line fits
over a strut in the frame (circled). Use a small piece of
masking tape to hold the line in place temporarily.
6
Identify the control levers,
12I
and
13I
, each with a brake
line connection. Test-fit rod
23G
across the sub-frame to
ensure the correct orientation; it fits between the control levers,
(
12I
and
13I
) as shown in the inset. The ends of part
23G
slot
over the corresponding eyelets in the control levers. Fix each
end in place with an
FP
screw.
NOTE:
Part
23G
goes under
the brake line connection that has been made to part
12I.
6
At the other end of the suspension arm,
repeat the assembly process of Step 4 to
fix a ‘left-handed’ lower trailing link (
23E
) to the
end of the axle 23G.
NOTE
how the two small
holes (circled) face upwards. Secure in position
with an
EM
screw, as shown.
7
6
Support the
control levers
as you screw the
ends of the rod in
place, to prevent
damage.
4
FP
FP
12I
23G
13I
23G
23D
23D
15
15
AGORA
MODELS
16
AGORA
MODELS
RM 857