Dynamic Accuracy Test
Function of the Test:
To measure the relative power linearity of the analyzer’s receivers.
Specification Tested:
Test Port Input–Dynamic Accuracy
Equipment Used:
The dynamic accuracy test set (Z5623A Option H01), a power meter
(E4418B or E4419B), power sensors, and two test cables.
Description of the Test:
1. The analyzer’s test ports are tested separately at a specific CW frequency and a
reference power level of
−
20 dBm.
2. The analyzer’s driving port is connected to the dynamic accuracy test set’s source port
and the analyzer’s receiving port is connected to the dynamic accuracy test set’s
receiver port. A power sensor is connected to the dynamic accuracy test set’s power
meter port.
3. The dynamic accuracy test set is used to input a signal from the driving port on the
analyzer. The input signal is routed through step attenuators to both the analyzer and
a power sensor.
4. The analyzer source and the dynamic accuracy test set create power levels that are
“deltas” from the reference power level of
−
20 dBm. Each delta is measured two ways:
by the power sensor and by the analyzer’s receiver under test.
5. The analyzer’s power level into the port under test is set to the
−
20 dBm reference
level.
6. The power level is measured with the power sensor: (
P
mr
).
7. The power level is measured using the analyzer’s receiver under test: (
P
pr
).
8. The power level into the analyzer’s port under test is stepped, in 5 dB steps, over the
range of 0 to
−
120 dBm. Each power level represents a “delta” from the reference power
level.
9. At each step, the power level is measured using the power meter: (
P
md
).
10. At each step, the power level is measured using the receiver under test: (
P
pd
).
11. The power error in dB
=
(
P
mr
−
P
md
)
−
(P
pr
−
P
pd
)
.
If the Analyzer Fails this Test:
• If the analyzer fails this test, replace the A20 mixer brick and then repeat this test.
“Removing and Replacing the A20 Mixer Brick (QuintBrick)” on page 7-26
• If the analyzer still fails this test, replace the A5 SPAM board and repeat this test.
“Removing and Replacing the A5 through A10 Boards” on page 7-16
Summary of Contents for N5230A
Page 10: ...Contents 6 Service Guide N5230 90014 Contents...
Page 11: ...Service Guide N5230 90014 1 1 1 Safety and Regulatory Information...
Page 19: ...Service Guide N5230 90014 2 1 2 General Product Information...
Page 31: ...Service Guide N5230 90014 3 1 3 Tests and Adjustments...
Page 71: ...Service Guide N5230 90014 4 1 4 Troubleshooting...
Page 121: ...Service Guide N5230 90014 5 1 5 Theory of Operation...
Page 147: ...Service Guide N5230 90014 6 1 6 Replaceable Parts...
Page 183: ...Service Guide N5230 90014 7 1 7 Repair and Replacement Procedures...
Page 229: ...Service Guide N5230 90014 8 1 8 General Purpose Maintenance Procedures...