Install Cable Enclosures, Wall Boxes, and Branch Cables
8-16
UTP Connections
It is the customer’s responsibility to install the Category 5 UTP cable,
terminate both ends, and certify the UTP installation. RJ45 connections
must be at the ACC and 110 edge connector must be terminated at the wall
box.
Parts Required
Parts required to install the UTP cable are listed in the following table.
Equipment Needed
Equipment needed to install the UTP cable is listed in the following table.
Quantity
Description
Part Numbers
1 per ACC branch
LDC Cable
78599AI
Option J03 – 3 ft. LDC cable
Option J06 – 6 ft. LDC cable
Option J10 – 10 ft. LDC cable
Option J20 – 20 ft. LDC cable
1 per ACC branch
SDN/UTP single
gang wall box
unit
78599AI
Option J12 – Quantity 1
Option J13 – Quantity 8
Option JJ1 – Quantity 1 (European)
Option JJ2 – Quantity 8 (European)
SDN/UTP dual
gang wall box kit
78599AI
Option J14 – Quantity 1
Option J15 – Quantity 8
1 per SDC or
XSDC cable
RJ45 to
connector cable
M3199AI J03
Quantity
Description
Part Numbers
1
Microtest PentaScanner Kit
Contact Anixter (see notes
below)
1
Test Adapter, 568A wiring
Amp 558908-I
1
Test Adapter, 568B wiring
Amp 558909-1
1
110 Punch Tool
1
Screwdriver - Pozi drive #1
1
Screwdriver - Pozi drive #2
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...