Section 8: Installation
SDN Installation
SDN Wiring Installation
UTP, SDC, or XSDC cables should be continuous from the location of the
ACC to the wallbox. Refer to pages 8-11 through 8-16 for more
information.
Instrument Connection to the SDN
Connect the instruments to their associated wall boxes using LDC cables.
Plug in any ACC terminated LDCs to the upstream connector in the IC.
Daisy-chain ICs which are to share one branch. Turn on power to the
instruments. Ensure that each SDN bedside instrument is in Demo Mode.
System Communication Verification
Verify the tuning range of each IC. Tune in SDN bedsides at IC. This
checks the SDN broadcast function of those bedsides and the SDN receive
function of the IC. Refer to the detailed procedures given in the IC
documentation.
Ensure that each SDN bedside instrument is in Demo Mode.
If instruments are missing, note their branch numbers and refer to “SDN
and ACC System Level Troubleshooting” on page 3-1.
Practical Checks
At each SDN bedside, verify that the UNIT ROSTER and BED LABEL
correspond with what the hospital staff wants at that location. Errors
indicate mistakes in wiring to the correct branch or mistakes in IC
programming.
Enter OVERVIEW mode for each bedside and verify the SDN receive
communication function of each SDN bedside. Step through several beds
using the NEXT BED softkey. Notice the bed label change. Press the
CLEAR hardkey.
While at each SDN bedside, request a REAL TIME recording and verify the
interactive SDN communication between bedsides and ICs. Press REAL
TIME softkey, select a waveform to be recorded (softkey), look for message
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...