SDN Installation
8-2
“CONTINUOUS RECORDING” at top of screen, wait about five seconds and
press the STOP softkey.
Reset each IC and verify that there are no error codes. Examine the
recorder strip to verify that ICs sharing the same recorder(s) are all on the
same SDN branch. Verify that each IC has a unique Box No. (0-3) and IC
I.D. No. (1-6).
Test and Inspection Procedures
The following test and inspection procedures are done by an Agilent-
qualified service provider at the time of installation or repair.
Test Block
Name
Test or Inspection to Perform
Expected Test
Results
What to Record on
Service Record
Visual:
For installation, perform visual inspection of shipping
case and contents. All other cases inspect installed
device.
No visible damage
V:P
or
V:F
Where P=Pass and F=Fail
Power On:
1.
Power on device.
2.
Examine all LED’s on the main PCB for normal
operation. The following is “normal operation”
• LED condition
DS6 Solid Red On
DS5 Solid Green On
DS1 Fast Flicker Red On
DS2 Off (Red)
DS3 Off (Red)
DS4 Solid Red On
DS8 Off (Yellow)
DS7 Off (Yellow)
Refer to Figure 8-1.
Examine the green LED on the front of the unit and the
LED on the power supply on the rear of the unit.
Are all LEDs indicating normal operation?
Expected answer
is “Yes”
PO:P
or
PO:F
Where P=Pass and F=Fail
Performance:
1.
Verify correct cable to branch location by turning on
the bedside monitor and checking for proper branch
numbering.
2.
Perform operational checkout. Scroll through all
connected beds in Overview, or tune in all
connected beds into the central station.
Does the system pass the performance checkout?
Expected answer
is “Yes”
P:P
or
P:F
Where P=Pass and F=Fail
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...