Introduction
7-6
Architect Checklist
Prior to Installation
___
Builder knows the number, size, and location of conduit runs.
___
Builder knows the number, location, and voltage of AC power
outlets.
___
Builder knows location and number of each type of system
outlet box.
___
Builder/electrician aware that he must install switch wall
boxes (and conduit when necessary).
___
Builder and electrician aware that only patient monitor
signal cables can be run in conduit and that AC power,
diathermy cables, and so on, should be run far enough away
to prevent interference—at least 0.3 m (1 ft.) away.
___
Builder aware that Agilent Technologies requires NEMA
conduit switch wall boxes at each bedside station, remote
station, and possibly at the Patient Information Center.
___
Builder aware that Agilent Technologies will supply
faceplates for standard NEMA switch wall boxes.
___
Builder aware that Agilent Technologies will supply SDN
Agilent CareNet Controller (ACC).
___
Builder aware that Agilent Technologies may supply SDN or
LAN cables.
___
Builder aware of mounting requirements of brackets and
shelves if these are to be used.
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...