GNA-2538 R0
4.5. Fuel Supply
Important
•
The planning, set up, and connection to the chosen fuel supply must be done by qualified installer of
service agency. The system must include an emergency shut-off valve.
•
Refer to the heater rating decal for determining the minimum gas supply pressure for obtaining the
maximum gas capacity for which this heater is specified.
Liquid Propane (LP) Fuel
• The supply tank should have a MINIMUM capacity of 1,000 gallons (3,785 liters). Some configurations may
require a larger tank or install additional tanks in parallel if you are using multiple heaters.
• The vaporization rate of propane constantly changes according to the ambient temperature and the amount
of liquid in the tank. The following table shows the vaporization rate of a 1,000 gallon (3,785 liter) tank at
various temperatures when the tank is 25% full.
Table 2.
Outside Temperature
Vapor Pressure
Volume
Fluid Volume
BTUs per
Hour
(1,000s)
Degrees
Fahrenheit
Degrees
Celsius
PSI
kPa
Cubic Feet
per hour
Cubic
Meters per
hour
Gallons per
hour
Liters per
hour
100
38
190
1310.0
710
20.1
19.5
73.8
1,794
90
32.2
165
1137.6
655
18.5
18
68.1
1,656
80
26.7
140
965.3
600
17.0
16.5
62.5
1,518
70
21.1
130
896.3
545
15.4
15.5
58.7
1,380
60
15.6
102
703.3
490
13.9
13.5
51.1
1,240
50
10
86
592.9
455
12.9
12.5
47.3
1,150
40
4.4
72
496.4
382
10.8
10.5
39.7
965
30
-1.1
58
399.9
327
9.3
9.0
34.1
826
20
-6.7
47
324.1
273
7.7
7.5
28.4
690
10
-12.2
37
255.1
218
6.2
6.0
22.7
551
0
-17.8
28
193.1
164
4.6
4.5
17.0
413
-10
-23.3
20
137.9
109
3.1
3.0
11.4
276
• The gas supplier will provide a tank and the connection to the heater. The gas supplier should test the
connections for leaks.
• At the owner’s discretion, a first stage liquid regulator may be included. It must be capable of 75 gph at
100 psi under flow. This item is not supplied by AGI.
• Storage tanks must be located at least 25’ (7,620 mm) from all structures, depending on local codes. Check
with the gas supplier for code specifications.
• Route the supply line in so line breakage from moving machinery is least likely. Line sizing charts have been
included in this manual. See
and
to assist in selecting the supply line
proper size.
AXIAL FAN HEATER – LP AND NG-FIRED HEATER