
DD+DIS303.03E
Installation
Planning
Edition 6, Revision 0
Classic E.O.S. / Classic E.O.S. CL
Chapter 14 / 41
(Type 5270 / 100 / 105)
13
Checklist for Installation Planning
General
yes no
1
System components
Film processor
Daylight system
Mixer
Replenisher tanks
Centralized disposal
Disposal tanks
Silver recovery (fixer, water)
2
Transport path
Sufficient floor load
Elevator (door size, load)
Door size
3
Installation version
Daylight
Darkroom
4
Unloading and unpacking
Free space provided for lifting the
machines off the pallet
Required external connections:
prepared:
yes no
5
Film processor
All-pole circuit breaker
Outlet (distance to machine:_____m)
6
Mixer
Outlet (distance to machine:_____m)
6
Silver recovery
Outlet (distance to machine:_____m)
7
Hose connections
Supply and disposal through rear wall
Supply and disposal through the floor
Exhaust hose required, length_____m
Exhaust: connection piece installed on
site
Supply hoses installed
Disposal hoses installed
8
Air conditioning system
Exhaust connection installed
Exhaust rate sufficient
9
Water connection
present
10
Free space around machine
Required minimum guaranteed
11
Wall opening
considered