![AGCO HayBoss G2 644A Operation Manual Download Page 14](http://html1.mh-extra.com/html/agco/hayboss-g2-644a/hayboss-g2-644a_operation-manual_2866426014.webp)
14
First Time and Annual Startup Instructions
THE UNIT MUST BE CHECKED OUT BEFORE FIELD OPERATION!
Check and Prime the Pumps
1. Put 10 gal (5L) of water in tank and turn main ball valve on.
2. Inspect for any leaks or drips at this time. If any are found tighten or replace area or fitting.
3. Turn controller on.
4. Press the SETUP MODE key. Turn bale rate sensors off. Make sure the AVG Bale Weight is 100 lbs and
the AVG Baler Length is 36” (92cm), Time per bale is 10 seconds, and press the MAIN MENU key to return
to the opening screen.
5. Press the MANUAL MODE key and the screen shown below will appear.
iPad
Note: The system comes with the tips already installed on the spray shield or nozzle tubes.
Pump
2-Tie Baler
Tip Output
(Lbs / Ton) (L/MT)
3-Tie Baler
Tip Output
(Lbs / Ton) (L/MT)
1
1.2
– 1.6 (.5 - .7L)
1.8
– 2.6 (.8 - 1.2L)
2
3.6
– 5.0 (1.6 - 2.3L)
3.6
– 5.0 (1.6 - 2.3L)
3
6.7
– 9.3 (3.0 - 4.2L)
10.0
– 13.4 (4.5 - 6.1L)
6. Turn pump 1 on (P1).
To turn the pump on, select the colored box next to P1 and change the ‘X’ to a check
mark Repeat the process for pumps 2 and 3 (P2 and P3).
7. This process will also be used to prime the pumps whenever needed.
8. While running pumps check for a good spray pattern out of the respective tips and verify that no parts of
the system are leaking.
9. While doing these tests the Volume Used on the bottom of the screen will be increasing, this verifies that
the flow meter is functioning.
10. The DCP button displays your connection signal with the Bluetooth receiver. Green
– DCP is connected,
Yellow
– DCP is connecting, Red – DCP not connected. Pressing MAIN MENU key to return to the initial
startup screen.
8
9
5
Summary of Contents for HayBoss G2 644A
Page 2: ...2 intentionally blank ...
Page 46: ...46 Notes ...