16
17
A Lay waste packaging plastic over the base rail.
This will prevent the pedal arm assembly from
scratching the elliptical’s paint.
B Open
hardware for step 8
.
C Attach
right swing arm
to
top
handrail
using 2
swing Caps
, 2
bolts
(C)
, 2
axles
and 2
washers (d)
.
D Attach the
right pedal arm
to the right
Crank
using 1
wavy washer (J)
, 1
washer (d)
and 1
bolt (C)
.
E Attach the
Crank Cap
to the
Crank
.
F Repeat on opposite side.
WASHER (D)
25 mm
Qty: 6
BOLT (C)
16 mm
Qty: 6
WAVY WASHER (J)
29 mm
Qty: 2
AXLE
Qty: 2
HARdWARE fOR STEp 8
:
CRANK
PACKAGING PLASTIC
WASHER (D)
WAVY WASHER (J)
BOLT (C)
CRANK CAP
SWING CAP
TOP HANDRAIL
WASHER (D)
BOLT (C)
AXLE
WASHER (D)
SWING CAP
BOLT (C)
RIGHT SWING ARM
RIGHT PEDAL ARM
LINK ARM
ASSEMBLY STEp 8
NOTE: Leave bolts loose until you have
finished STEP D.
ASSEMBLY STEp 7
A
Open
hardware for step 7
.
B
Attach
right link arm
to
right pedal
arm
using 1
bolt (C)
, 1
washer (p)
and 1
wavy washer (m)
.
C
Repeat on opposite side.
WASHER (L)
18 mm
Qty: 8
BOLT (K)
12 mm
Qty: 8
BOLT (C)
16 mm
Qty: 2
WASHER (P)
38 mm
Qty: 2
WAVY WASHER (M)
34 mm
Qty: 2
HARdWARE fOR STEp 7
:
PEDAL ARM
BOLT (C)
WASHER (P)
WAVY WASHER (M)
LINK ARM
181AXT_OM_Rev1_6.indd 16-17
7/22/11 2:28 PM