
34
CS 16 - CS 20 - OI-vers. 5.3 gb. 20190312
Operating sequence of the intermediate position when returing
Positions
Pressure on
Description
1
P1
P4
Slide rear Catch off
2
P2
P4
Slide moves to the front Catch off
3
P2
P3
Slide front Catch off
4
P1
P3
Slide moves to intermediate position Catch
off
5
P1
Pulse on
Approx. P2
(ca.0.2sec
venting)
Before starting from the intermediate
position,
both air chambers must
absolutely be vented
so that the amply air
chambers are not moved to and the exhaust
air flow control can function. Otherwise
module damage must be expected
6
P4
Catch on
7
P1
P4
Slide returns to home position (slide rear)
Catch on
Summary of Contents for CS 16/30
Page 10: ...CS 16 CS 20 OI vers 5 3 gb 20190312 9 2 1 4 Slide unit load factors CS 16 ...
Page 11: ...10 CS 16 CS 20 OI vers 5 3 gb 20190312 2 1 5 Preferred combinations CS 16 ...
Page 12: ...CS 16 CS 20 OI vers 5 3 gb 20190312 11 2 1 6 Slide unit load factors CS 20 ...
Page 13: ...12 CS 16 CS 20 OI vers 5 3 gb 20190312 2 1 7 Preferred combinations CS 20 ...
Page 19: ...18 CS 16 CS 20 OI vers 5 3 gb 20190312 3 1 8 Dimension CS 16 ...
Page 20: ...CS 16 CS 20 OI vers 5 3 gb 20190312 19 3 1 9 Technical data CS 16 ...
Page 21: ...20 CS 16 CS 20 OI vers 5 3 gb 20190312 3 2 0 Dimension CS 20 ...
Page 22: ...CS 16 CS 20 OI vers 5 3 gb 20190312 21 3 2 1 Technical data CS 20 ...
Page 42: ...CS 16 CS 20 OI vers 5 3 gb 20190312 41 4 1 2 Accessories for CS 16 CS 20 module ...
Page 44: ...CS 16 CS 20 OI vers 5 3 gb 20190312 43 ZA intermediate stops for the CS 16 CS 20 ...
Page 48: ......