![AeroWorks 50cc YAK-54 ARF-QB Assembly Manual Download Page 55](http://html1.mh-extra.com/html/aeroworks/50cc-yak-54-arf-qb/50cc-yak-54-arf-qb_assembly-manual_2863255055.webp)
55
20.
Use a pair of scissors to split one end of the
silicon tubing in half approximately 3/4” deep
as shown.
21.
After splitting the silicon tubing cut off one
side of the split section as shown. This will
provide a relief section of the tubing for the
nylon tie lock and insulate it from the metal
canister surface.
22.
Prepare to slide the silicon tubing onto the ny-
lon tie. The split end of the tubing goes oppo-
site the nylon tie lock a shown.
23.
Slide the silicon tubing onto the nylon tie as
shown to form the canister strap assembly.