![AeroWorks 50cc Ultimate 20-300 ARF-QB Assembly Manual Download Page 35](http://html1.mh-extra.com/html/aeroworks/50cc-ultimate-20-300-arf-qb/50cc-ultimate-20-300-arf-qb_assembly-manual_2863254035.webp)
35
Engine Installation
1. The 50cc Ultimate 20-300 will accept a wide
range of engine types. Illustrations for a DA-50
installation are provided below. Gather the en-
gine, and mounting hardware as shown below.
Note:
2 1/2” Standoffs are required for the DA 50
Note:
Engine mounting hardware is
Not Supplied
The correct distance from the firewall to the
front of the prop hub is:
6 5/8”
ENGINE INSTALLATION
2. 6mm Machined Aluminum spacers are included
to set the proper stand off distance for your en-
gine.
3. Locate the laser cut engine mounting template
for the DA-50.
Note:
If other engines are used the templates may
be modified to fit you engine selection. Center
your engine over the laser marked thrust lines
on the template. Mark and drill the engine
mounting hole locations for your engine.
Follow the next steps for mounting your
engine
4. Align template to firewall and tape template se-
curely in place. Use a 1/4 drill bit to drill the
engine mounting holes in firewall. After drilling
is finished, remove template from firewall.