4
Section 2. SET UP PROCEDURE
This manual describes methods, which are distinctive to the
Stealth KPL 2
. Procedures, typical for
all gliders are described in less detail.
The set up procedure should be carried out on a clean, non abrasive surface.
ATTENTION:
After each set up procedure you must do a preflight inspection of the glider.
2.1. Set up procedure from the 4 meters long package
2.1.1. With the glider in the bag (4 metres long) lay the glider on the ground.
2.1.2. Unzip the zipper. Undo the velcro straps. Remove the batten bags, the speedbar, the aft
leading edge tubes (N3) and wing tips from the bag.
2.1.3. Unfold the sail along the leading edge. Attach the aft leading edge tubes (N3) to the forward
leading edge tubes (N2) according to the marking (L-left, R-right, marks must be on the top).
2.1.4. While installing the leading edge tubes into the sail, place the washout tips facing forward
toward the nose of the wing and along the leading edge tubes (Fig.1). Note: put washout tips
outside the sail, through zipper holes. Tighten the sail along the leading edge and put the sail mount
webbing into the slot in the end cap.
Fig. 1
2.1.5. Install the dive sticks to the corresponding places on the LE-tube/X-beem junctions. Attach
the dive sticks using pins and safety rings (Fig. 2). The dive sticks must be outside of the bottom
surface.
Summary of Contents for Stealth 13 KPL 2
Page 4: ...3 Test pilot______________________________ __________________________...
Page 22: ...21 TABLE OF CHANGE AND ADDITION DATE WORK DONE BY WHOM...
Page 26: ...25 THE FRAME...
Page 27: ...26 NOSE JUNCTION...
Page 28: ...27 HANG POINT SYSTEM...
Page 29: ...28 REAR KEEL LINE...
Page 30: ...29 CROSS BEAM JUNCTION...
Page 31: ...30 STRUT SYSTEM...
Page 32: ...31 COMPLETE RIGHT UPRIGHT...
Page 33: ...32 COMPLETE LEFT UPRIGHT...
Page 34: ...33 VG ROPE SYSTEM...