15
Fig. 14
4.1.4. Detach the shackle of the crosss-beam tensioning wires from the hook.
4.1.5. Pull the nose cone off and detach the ring of bottom front wires from the hook.
4.1.6. Unzip the bottom surface, put out the hangpoint spreader bar from the tower on the keel tube
and orientate the paddings sewed on the sail so that they protect the hardware fittings of the
uprights from the contact with sail (Fig. 15). Zip the zipper.
Fig. 15
4.1.6. Pull in the wings slightly and remove all battens except the top battens No.1. Remove only
the batten cords from these battens. Put the battens into the bags.
Do not forget to remove the undersurface battens from the sail !
4.1.7. Pull the wings in parrallel to the keel tube.
Take care that the shackle of the cross-beam
tensioning wires don’t get caught where it enters the sail !
Pull out small masts on the LE-
tube/X-beam junction. Spread the sail so that both the top and bottom surfaces of the sail are
Summary of Contents for Stealth 13 KPL 2
Page 4: ...3 Test pilot______________________________ __________________________...
Page 22: ...21 TABLE OF CHANGE AND ADDITION DATE WORK DONE BY WHOM...
Page 26: ...25 THE FRAME...
Page 27: ...26 NOSE JUNCTION...
Page 28: ...27 HANG POINT SYSTEM...
Page 29: ...28 REAR KEEL LINE...
Page 30: ...29 CROSS BEAM JUNCTION...
Page 31: ...30 STRUT SYSTEM...
Page 32: ...31 COMPLETE RIGHT UPRIGHT...
Page 33: ...32 COMPLETE LEFT UPRIGHT...
Page 34: ...33 VG ROPE SYSTEM...