14
Section 4. BREAKDOWN
4.1. Breakdown into the 6 metres long package
4.1.1. Take the VG off and detach the plastic wingtips.
4.1.2. Pull out the washout struts and place them along the leading edge out of the sail in directon of
the tips. Remove the battens from the outboard section of the sail. Put the outboard wing tip bags on
(Fig. 13).
Fig. 13
4.1.3. Prepare for removal of the dive sticks by first unzipping the sail and removing strut from
inner surface (Fig. 14).