![Aeronaut 3033/00 Assembly Instructions Manual Download Page 22](http://html1.mh-extra.com/html/aeronaut/3033-00/3033-00_assembly-instructions-manual_2862741022.webp)
84
85
87
86
81
81
81
82
83
The tug´s ventilation system for below deck
quarters is located at the front of the
superstructure.
Glue together parts 81, 82 and glue in place in
front panel of super structure.
Glue part 84 to the inside of part 81, then glue in
place parts 85 and 86.
Glue part 87 on top of ventilation system.
Glue part 84 to inside of part
83, then glue part 83 into front
of superstructure.
View of completed vetnitlation system at front end of
superstructure.
Note:
Photo etched ventilation grille will be installed at a
later stage.
15
17
16
84